Residential Green Energy
Effective January 1, 2021
Type of Service
Single phase, 60 cycles, at available secondary voltage.
Availability
This rate is for those residential members who have chosen to enroll in the “Green Energy” program and who have signed a “Green Energy” Purchase Agreement.
Monthly Rates
Base Rate |
$30.00/month |
---|---|
Demand Charge |
$6.00/kw |
Energy Charge |
$0.05846/kwh |
Minimum Charge
The minimum monthly charge shall be the higher of the following:
- The cost for service as calculated by the rates specified.
- $1.00 per KVA installed transformer capacity over 10 KVA for overhead and over 15 KVA for underground, plus the base rate.